October 7, 2025
Quick electric charging station comes into operation along Narayangadh-Butwal section

Quick electric charging station comes into operation along Narayangadh-Butwal section

Spread the love

A quick charging station for charging electric vehicles has come into operation at Kawasoti-11 in Nawalparasi (Bardaghat-Susta East).Quick electric charging station comes into operation along Narayangadh-Butwal section

The charging station has office to charge five little and expansive vehicles at the same time. A neighborhood Bishnu Adhikari said he set up the charging station on his five kattha of arrive with the back of the Nepal Power Specialist. A add up to of Rs 10 million was contributed for the same.Quick electric charging station comes into operation along Narayangadh-Butwal section

He shared that he has too set a arrange of working ‘refreshment centre’ for drivers. The charging station has the office of charging electric vehicles for 24 hours in the quick charging station, the as it were charge station built up along the114-km Narayangadh-Butwal street area.Quick electric charging station comes into operation along Narayangadh-Butwal section

Adhikari said that in normal around 50 vehicles can be charged every day at the station, but issue has surfaced due to the delay in development of the street.

They are too arranging to include 10 more spouts once the Narayangadh-Butwal street extension assignment completes,

Related,

How Spain’s economy got to be the envy of Europe


Spread the love

1 thought on “Quick electric charging station comes into operation along Narayangadh-Butwal section

Leave a Reply

Your email address will not be published. Required fields are marked *